This document has been declared "Stabilized" and will no longer be subjected to periodic reviews for currency. Users are responsible for verifying references and continued suitability or technical requirements. New technology may exist.This recommended practice describes the requirements of a special purpose 10 mDF feed through capacitor to be used in series with the power line to an electrical or electronic device during EMI tests.