ANS 58.8-2019 establishes criteria and methods for identifying, calculating, validating, tracking, and documenting time requirements for the performance of nuclear power plant time-limited manual actions that are associated with either design-basis events (DBEs) or licensing basis.
Product Details
Published: 08/08/2019 ANSI: ANSI Approved Number of Pages: 22 File Size: 1 file , 730 KB